Air-Cooled Trane RTHA retrofit at the Navy Hospital
ATT Building (above 3 pics) in Downtown San Diego; The project consisted of retrofitting the existing 600 Ton York Centrifugal Chiller with (4) TT-400 Turbocor compressors, installing a new cooling tower via helicopter lift and new boilers. This All-Variable-Speed Application central plant is now operating in the .38 kW/Ton range and is one of the most efficient buildings in Downtown San Diego.
San Diego Unified Port District - Alpha was awarded a Demo of existing and installation of, new McQuay WMC chiller with Turbocor compressors, new cooling tower on the roof, new boilers & split systems.
The above images with red pipes show a 1600- Ton Cooling Tower that was installed at the Wells Fargo Bldg. downtown via helicopter lift by Alpha MSE. The above image at right shows 2 1000 HP VFD’s at Wells Fargo also installed by Alpha Mech.
TENANT IMPROVEMENT
Alpha performed a Design/Build renovation of the Keating Hotel (circa 1850) in Downtown San Diego. The project consisted of renovating all the rooms with new HVAC units and replacing the kitchen grease ducting for Croce’s Restaurant.
This project was completed for the Irvine Company at their Xantrex Industrial Facility. The scope of work consisted of replacing (8) units, (250) Tons total, with Trane Intellipaks. This was a turnkey weekend project resulting in no down time for the customer.
Please ContactAlpha Mechanical to learn more about how Alpha can deliver real-time system optimization and help reduce operating costs.